AG真人

中文 English
Shandong xiongtai machinery group co., ltd.
  • home
  • About Us
  • Product
  • Video
  • Honor
  • case
  • News
  • Contact
  • Position:Home>COMPANY NEWS

    How to improve work efficiency in hydraulic core drilling rig construction?

    Release time:2020-10-31    This article is read 1131 second

    Hydraulic core drilling rigs are suitable for general survey exploration, geophysical exploration, road and construction exploration and blast hole drilling projects. Drill bits such as alloys, diamonds and composite chips can be selected according to the different bottom layers. Believe how to improve work efficiency in the construction of hydraulic core drilling rigs? It must be the most concerned topic for the majority of users. Let me share with you some tips on hydraulic drilling rig construction.

    The construction site of the hydraulic core drilling rig must be kept clean, and the hole position and surrounding stones and other obstacles should be clear as required. The motors and control machines of our hydraulic core drilling rigs should have good grounding devices. The working site is within 200 meters from the power transformer or the main power supply line, and the voltage during start-up shall not exceed 10% of the rated voltage. Before installing the hydraulic core drilling rig, check and confirm that the drill pipe and various components are in good condition. The hydraulic core drilling rig should be placed stably and firmly. Before starting the rig, make sure that all operating rods are in neutral. After starting, do not worry about construction, run idling first, and check whether the instrument and temperature are normal. During construction, the drill rod should be lowered slowly so that the drill bit is aligned with the hole position. When drilling a stuck drill, immediately cut off the power supply, stop drilling, and do not start the drill until the cause is found. If it is necessary to change the rotation direction of the drill rod during operation, the drill rod should be completely stopped before drilling. When the power is cut off, the controllers should be placed at the zero position, the power supply should be cut off, and all the drill rods should be pulled out in time to make the drill bit touch the ground. When the drilling rig is running, the cable should be wrapped around the drill pipe. It is strictly forbidden to clear the soil on the spiral piece by hand when drilling. After the operation, the drill pipe and the drill bit should be lifted out of the hole, and the soil on the drill pipe and the spiral blade should be removed first. When the drill bit is pressed to touch the ground, all parts are braked, and the joystick is placed in the neutral position to cut off the power. When the damage of the drill reaches 20mm, replace it in time.

    液压岩心钻机xt1.png

    The above are the construction tips of hydraulic core drilling rigs. I hope everyone can operate the equipment as mentioned above to improve the working efficiency of hydraulic core drilling rigs.

    How to improve work efficiency in hydraulic core drilling rig construction?
    The last one:Hoisting machine type 50 drilling rigNext item:Hoisting machine type 50 drilling rig
    AG真人·(中国)官方网站

    400-0537-369

    Shandong xiongtai machinery group co. LTD
    National free sales hotline: 400-0537-369
    Seat: 0537-2339569 
    Fax: 0537-2339569
    WeChat: 15905372283
    Email address: xiongtaijx@163.com
    Address: shuyuan industrial park, qufu city, jining city, shandong province

    AG真人·(中国)官方网站

    Mobile Station

    Copyright:Shandong xiongtai machinery group co., ltd. All rights reserved      Lu ICP 19020630 -1   公示信息

    【网站地图】【sitemap】