So what should be paid attention to during the operation of soil sampling drilling rig? Let me explain the problems that need attention in the operation of soil sampling drilling rig.
1. After starting the gasoline engine, run it at idle for a period of time to warm up the machine.

2. According to actual needs, slowly advance the throttle switch to a suitable position.

3. It is normal that there is oil leakage from the bottom of the equipment. Every 20 hours of operation, about 50ML of No. 2 aviation grease (liquid) should be injected into the cylinder.
| The last one:Hoisting machine type 50 drilling rig | Next item:Hoisting machine type 50 drilling rig |




Lu ICP 19020630 -1 
Telephone
product
case
contact